Nuisance wildlife control

7 A/B, Gautam Arcade.,Opp. ICICI Bank,
Nr.Radhekrishna Temple, Tilak Road,
Kopari, Thane (East)-400 603.
call us:
+91 9987285555
022 65659101

Anti Termite Treatment

The termite colony consists of queen, king, soldiers and the workers. Queen has a great capacity to lay eggs. In some species, the mature queen has a greatly distended abdomen and may produce 20,000 to 30,000 eggs a day. King take part in mating only,Soldiers protect the colony from predators and the Worker termites work 24 hours, search the food, construct the colony , take care of new born termites and main thing is make damage/infest the cellulose containing material i.e. wood, paper and clothes but they can damage the non cellulose material also in search of their food, .Where there is termite infestation we see the worker termites.

Swarming termites- When a colony has matured, winged, swarming termites can be seen around windows and doors. Winged termites are highly attracted to sources of light and are most active in springtime. After mating, these termites locate a new breeding site and create another colony, spreading infestations throughout multiple locations




The main sign of infestation is the muddy channels formed in building, sometimes we see the infestation seen in wooden structures. Mainly in the lofts, near water leakages, in damaged building structures we see the infestation as they can get easily entry from the cracks, once they get entry they start damaging the whole structure very fast which can destroy the interior structure and also damage the building structure.





Post Construction Anti Termite Treatment- For ready structure (Drill, Fill & Seal) As per IS 6313-Part-III-Specification

1. Drilling :
For Inside Premises :The drilling will be done to the junction of wall and floor or above the skirting level, drilling will be done to effective depth of 4 to 5 inches and 15 to 18 inches apart.

For Outside premises- Drilling will be done to effective depth of 9 inches and 1 feet apart. For outside drilling will be carried out to staircase, passage, society office, meter rooms etc. Also sparying will be done over the muddy channels made by termite and the channel will remove after the spraying.

2. Filling :

The holes will be filled with termiticide solution, the filling procedure is repeated two to three time to make effective chemical barrier against termite.

3. Sealing- Chemical filled holes shall be sealed with white or black cement. The muddy channels made by termite will also treated by spraying and the channels will be removed from infested places.

4. Special Note : - We are using Metal Detector Machine to avoid plumbing as wells as electric damage during the drilling process.



Pre Construction Anti Termite Treatment- For construction site.
(Reference Specification- IS-6313 Part-II of 1981 and IS-IS-8944- 1978)
Stages
1.Treatment to Excavated area.
2.Treatment to the Top surface of the Plinth.
3.Treatment at the Junction of the wall & the floor.
4.Treatment of soil Along the External Perimeter of Building.
5.Treatment of the soil surrounding pipes, conduits and expansion joints.